Tech

Donald-Aurora Interchange ramps to shut for building on I-5

[ad_1]

On and off ramps on the Donald-Aurora Interchange, Exit 278, of Interstate 5 shall be closed for per week at a time by way of the remainder of the month as a part of the development undertaking.

The northbound on-ramp shall be closed from Aug. 7 to Aug. 14.

The southbound off-ramp shall be closed from Aug. 14 to Aug. 21.

The southbound on-ramp shall be closed from Aug. 21 to Aug. 28.

The ramps are being lengthened and widened.

The northbound off-ramp was lengthened and widened within the first part of the undertaking in 2022.

The $62.5 million construction project on the Donald-Aurora Interchange has been underway since 2021, however this part of the undertaking began building this yr.

The rendering for the Donald-Aurora Interchange.

The rendering for the Donald-Aurora Interchange.

The undertaking is anticipated to be accomplished in 2027.

Up to two lanes of Interstate 5 are being closed from 8 p.m. to eight a.m. Sundays by way of Thursdays. One lane shall be closed on different roads within the space from 9 p.m. to six a.m.

Other work that is being done as part of this phase of construction consists of changing the Interstate 5 bridges over Ehlen Highway, widening Ehlen Highway to 2 lanes in every course underneath the Interstate 5 bridge, relocating the Ehlen Highway and Bents Highway intersection and relocating the Ehlen Highway and Delores Means intersection.

Invoice Poehler covers Marion and Polk County for the Statesman Journal. Contact him at bpoehler@StatesmanJournal.com

This text initially appeared on Salem Statesman Journal: Donald-Aurora Interchange ramps to close for construction on I-5

[ad_2]

Source

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button